Work on the bathroom is continuing. The vanity needs 3 drawers and a cabinet door built.
We have to pick out some flooring and get it laid so we can install the toilet.
We have the tile for the shower. We're just waiting for the tile guy to come and install it.
This is looking into the bathroom from the bedroom.
No comments:
Post a Comment