Saturday, September 19, 2009

September 19, 2009



Work continues in the bedroom. Kate has already been installed above where the head of the bed will be. The slide-out frame has been covered with wood and we've started painting the walls.

We're waiting for the mirror sliding doors for the closet.


The pocket door has been installed. The laundry centre needs a big drawer on the bottom and the rest of the cabinet needs doors.

The TV cabinet is framed. It just needs some doors on the lower part.
















No comments:

Post a Comment