Thursday, September 17, 2009

August 31, 2009 continued.

The kitchen/living room ceilings have the tin installed. The refrigerator is being installed. The propane heater has been installed in the end of the kitchen cabinets.




The 2 door Dometic refrigerator.


The hall closet beside the refrigerator.



The lower kitchen cabinets have been started. The hand painted Mexican sink has been installed.





No comments:

Post a Comment