July 12, 2009 - 1/4" plywood has been put on the walls & ceiling of the bedroom and the plywood has been painted with primer in preparation for wallpaper.
July 12, 2009 - The holding tanks have been installed and the plumbing roughed in. The interior walls for the bathroom and kitchen have been built. The refrigerator space and kitchen closet have been built. Some of the 1/4" plywood has been put on the walls. The kitchen/livingroom ceilings have been strapped. The lower kitchen cabinets have been roughed in.
No comments:
Post a Comment