Tuesday, October 27, 2009
Friday, October 16, 2009
Tuesday, October 13, 2009
The Shower
Saturday, September 19, 2009
September 19, 2009
September 19, 2009
Work on the bathroom is continuing. The vanity needs 3 drawers and a cabinet door built.
We have to pick out some flooring and get it laid so we can install the toilet.
We have the tile for the shower. We're just waiting for the tile guy to come and install it.
This is looking into the bathroom from the bedroom.
September 19, 2009
Work continues in the bedroom. Kate has already been installed above where the head of the bed will be. The slide-out frame has been covered with wood and we've started painting the walls.
We're waiting for the mirror sliding doors for the closet.
The pocket door has been installed. The laundry centre needs a big drawer on the bottom and the rest of the cabinet needs doors.
The TV cabinet is framed. It just needs some doors on the lower part.
Thursday, September 17, 2009
August 31, 2009 continued.
The kitchen/living room ceilings have the tin installed. The refrigerator is being installed. The propane heater has been installed in the end of the kitchen cabinets.

The 2 door Dometic refrigerator.

The hall closet beside the refrigerator.

The lower kitchen cabinets have been started. The hand painted Mexican sink has been installed.
The 2 door Dometic refrigerator.
The hall closet beside the refrigerator.
The lower kitchen cabinets have been started. The hand painted Mexican sink has been installed.